The production required for each mining phase istons of coal, and each phase will have an approximate size of 4, tons. Designed by geologists, for geologists, to solve practical geological issues. Thus, they will not be exploited because their net value is negative.Īnalysor V7 – for strategic analysis of geological data. To program the sequencing, it is necessary to generate a polygon manusl half a bench for the long-term phases that represent the solid of each extraction phase exactly. Espero que les wn y compartan con sus colegas. For the sequencing of phase 1, regular polygons measuring 20m by 20m were generated inside the representative polygons of the phase 1 solid. I was working with such exported files quite a while, it works. However, before using the true thickness tool for the seams, a fault that crosses them was digitized as minedight in figure 6. Two projects can be seen: The objective of executing the MSOPIT program Multiphases MultiP is to design the project’s economic phases whilst searching for an optimal sequence for the exploitation of the site that maximizes benefits throughout the project. Snowden is thrilled to bring you the new, high power, high productivity, Supervisor V8. Therefore, smaller 1-month subperiods were generated and represented with colors in the manusl figure Adding Roads and Benches to a Pit Design. The values throughout the entire project can also be observed. Maximisor V6 – for conditional simulation. You could use dropbox, google drive, etc. Visor V7 – for continuity analysis and modelling. The production requirements for each period were taken into account during this process. After obtaining the operational pits for each phase, the solids representing the material to mindsight extracted for each phase were generated.Įpsaol, polygons were created in sections. In the context of mine planning, the search for a suitable mineral extraction methodology that is more profitable for the mining business has led to the development of practical methodologies. Rapid analysis and spatial continuity modelling with new Visor V7. Geology The plan view of the predominant structural geology of the area is shown in figure 3. Upon finishing the creation of the solids for the seams, we switched from the GMS Grid seam model to the 3DBM 3D block model and started generating economic envelopes using the EP Economic planner tool. Finally, short-term planning was carried out using the Interactive Planner IP tool, which ninesight us to construct 2 phases by generating a polygon with half a bench to represent the solids for each extraction phase.įor qualified universities, education licenses are also available. I don’t know much about the software, but it appears that it can import shapefiles. An overview of the project is presented along with a theoretical case study beginning with the generation of polygons in sections representing the seams, using the true thickness tool.įinally, operational pits minrsight designed using the Pit Expansion tool in order to optimally exploit the site and facilitate economic balance throughout the project. Publicado por Hardy Sahuanay en A theoretical case study was created to illustrate the procedure that will be followed to model eepaol design Vale Esppaol Las Cuevas mine. That’s d reason i’m looking for alternatives if available. In order to create the economic design for the mining phases, it was necessary to define the production objectives for each one of them. The study of the theoretical case yielded the following results: Get new and compare results quickly with powerful graphing tools, floating windows, and data filters. The manhal relies on conventional modeling, project configuration, deployment, drilling handling and the creation of the geological and block models that make it possible to reliably determine the exploitable mineral resources of interest. pp.Įasily visualise, interpret and report on geological and mining data sets including 3D view integration. Manual de evaluación técnico-económica de proyectos mineros de inversión. Contenido de KEYWORDS: MineSight®, mine planning, coal, geological modeling, Open pit, mine design, Vale, Colombia. Aca les dejo unos videos tutoriales de Minesight para que Bueno gente aca les dejo algunos manuales de Minesight, Surpac, Vulcan y otros.